Skip to content

How the planners work

Methodology: where our numbers come from

Every number our planners use is one fact from a published document: 3,742 facts from 683 documents, each stored with its source, a short quote and the date we checked it. Where documents disagree, we keep every value and say which one a plan uses.

Last changed

Where the numbers come from

We take numbers from the people who publish them as their own: federal standards such as NIST’s lumber and plywood standards and the USDA Forest Products Laboratory’s reports, state transportation departments’ drawings, the driveway, sidewalk and fence rules cities publish as their own law, and the data sheets and install guides of the companies that make the product. A trade association’s printed value is used one at a time, with its document named. Wage and climate files from the Bureau of Labor Statistics and NOAA are collected for features still to come.

Documents behind our data, by kind
Kind of documentDocumentsFactsMost cited
Federal standards and data74602USDA Forest Service, Forest Products Laboratory; NIST (U.S. Department of Commerce); U.S. Bureau of Labor Statistics
State and city rules207305California Department of Transportation (Caltrans); City of Minot, North Dakota; City of Shaker Heights, Ohio
University extension services1646Mississippi State University Extension; University of Maryland Extension; University of Georgia Extension
Manufacturers’ data sheets, catalogs and install guides2762,218QUIKRETE; Master Halco, Inc.; SAKRETE
Trade associations64237Common Ground Alliance / 811 Before You Dig; International Code Council; Canadian Wood Council
Supplier price lists12222GreenWaste / Florin Perkins Landscape Materials, Sacramento CA; Curb Cart Concrete, Murray and Lehi UT; Townsend Concrete, Vacaville CA
Other34112DIYCalcs (diycalcs.org); CalcShed (calcshed.com); ICC Evaluation Service

The newest document was checked on . 512 documents are saved as files with a hash of their bytes, so we can tell later whether a document changed. 50 we have seen only as a search excerpt; their facts carry a mark and are checked against the page itself before a planner uses them. 121 would not open, and we did not get around a block to read them.

Some sources are left out on purpose: retailers’ sites that forbid collection, paid standards we can’t quote, and sites whose terms forbid automated reading or use by AI. Where a free government document repeats a number from a paid standard, we cite the government document.

How a number is stored

A fact is one value as a document prints it, never a whole table. Each one records the value and its unit; the words as printed; whether it is exact, a maximum, a minimum, a range or approximate; the product and conditions it applies to; the document, the place in it and a quote to find it again; the kind of evidence; the day it was checked; and a status. A value printed for one size is not stretched to cover another.

One fact, as we store it

This is the yield of an eighty pound bag of concrete mix, the number our slab and fence plans use most.

Value
0.6 cu ft
As printed
0.60 ft3 (17 L)
Qualifier
approx
Applies to
Per bag, mixed as directed
Document
QUIKRETE Concrete Mix No. 1101 - Product Data Sheet (Product No. 1101-40, -50, -60, -80, -90) (Revised October 2022)
Where in it
p. 1, Yield
Quote
“An 80 lb (36.2 kg) bag yields approximately 0.60 ft3 (17 L)”
Evidence
manufacturer datasheet
Status
verified
Checked
Snapshot
quikrete-1101-datasheet.pdf, sha256 aa77610bd5d11acf1a09497e9f9fbaad480d42eaf349a23f9fa69890d06a2294

What a status means

  • Draft2,628 facts

    Recorded from the document. A script checks that the number appears in the saved copy.

  • Verified839 facts

    A second reader checked the fact against the saved copy and agrees it was understood right.

  • Disputed265 facts

    Another document, or another page of the same one, prints a different value. Both stay.

  • Superseded2 facts

    Replaced by a newer edition. The old fact stays in the data with this mark.

How the planners use them

A planner never holds a number of its own. Its constants sit in one place in the code, and each names the fact it comes from by its id. A test reads our data files and stops the build when a fact is missing, comes from another document, or holds a different number than the constant. A conversion, such as feet to inches, is written beside the constant with its reason and checked the same way.

Today the planners’ constants cite 163 facts from 68 documents. 56 of those facts are marked disputed; the next section shows what a plan does with them.

The arithmetic is code with tests of its own. No number on a plan is typed in by hand or written by a language model.

When sources disagree

When documents disagree, even two editions of the same maker’s sheet, we keep every value with the document that prints it. A plan that relies on one of those numbers names the value it uses and gives its reason in one line, so you can check the choice against the document.

A choice is made where two documents print different values for the same quantity and a plan needs one of them. The rule is written in the planner’s code, beside the value it takes, and the reason it gives is printed on the plan. A value taken from a state or city code is the text that place published; a federal standard’s value is taken as printed.

The numbers where a plan chooses between values are in the next section, each with every value it weighed. Values our data marks disputed are counted by topic after them. The same cases were also run through other calculators, further down.

Where sources disagree

265 values in our data are marked disputed, across 15 topics and 111 documents. Each is shown as its document prints it, or as our arithmetic on a printed value.

Where a plan chooses between values

14 numbers are chosen between on the planners’ pages, in the cases below. Each card gives every value, its document, and the one the plan uses.

Fence Calculator: Fence 100 ft, 6 ft high

How deep to set the posts of a 6 ft fence

The plan uses: 1/3 of the post's length, which both bag makers print; QUIKRETE's calculator says the same in other words.

Hole diameter for a 4x4 post

The plan uses: 10 1/2 in: three times the post, the rule printed on both makers' bags. The fence makers dig smaller holes for their own posts.

Gravel under each post

The plan uses: 6 in, QUIKRETE's, the maker whose depth rule and bags the estimate uses.

Concrete Slab Calculator: Slab 12 x 12 ft, 4 in

Control joint spacing for a 4 in slab

The plan uses: 8 ft: the tighter of QUIKRETE's upper limit and NRMCA's lower one, so both are met.

How deep to cut control joints

The plan uses: A quarter, with NRMCA and QUIKRETE; cutting a third is deeper and also fine.

Extra concrete over the measured volume

The plan uses: 10%, Sakrete's: running short mid-pour costs more than a spare bag.

Gravel base under a walk or small slab

The plan uses: 4 in, the depth two of the four standards draw; QUIKRETE only says "several inches".

Weight of a cubic yard of base rock

The plan uses: 1.85 tons, WSDOT's weight of compacted base; the quarries' calculators weigh rock by its source and grading.

Paver Patio Calculator: Patio 12 x 16 ft, 4x8 pavers

Gravel base under a patio

The plan uses: 6 in, the low end of Unilock's patio range; go deeper on clay.

What a 50 lb bag of polymeric sand covers

The plan uses: 65 sq ft, the low end of Alliance Gator's range for narrow joints; wide joints take far more.

Spike spacing along the edge restraint

The plan uses: 12 in, Snap Edge's preferred spacing.

Weight of a cubic yard of base rock and of sand

The plan uses: WSDOT's compacted base and Martin Marietta's sand; ask your yard what its rock weighs.

Pieces per sq ft of a 4x8 paver

The plan uses: 4.66, Pavestone's, for the product chosen; check your maker's sheet.

Other disputed values, by topic

Each topic’s count is in the table, and its first values open under its name. The rest are in our data and are not printed here. Values a plan uses are not repeated in these lists; they are the cards above.

Disputed values by topic, and how many each topic lists
TopicDisputed valuesDocumentsListed here
Gravel, sand and bulk materials640
Stains, sealers and resurfacers535
Bagged concrete28145
Decking3965
Fence installation1695
Fence materials111
Footing forms and tubes2475
Lumber and panels945
Block, mortar and retaining walls27125
Pavers26135
Prices2625
Permits, fence rules and dig notices14145
Concrete slabs, joints and bases30135
Mixers and tools1285
Wood durability and treatment222
Gravel, sand and bulk materials6 values
Stains, sealers and resurfacers5 values
Stains, sealers and resurfacers: disputed values, the first listed
WhatProduct or caseValueDocument
YieldQUIKRETE Re-Cap Concrete Resurfacer No. 1131-47 (40 lb bag)one 40 lb bag, 1/4 in thicknessapproximately 16 ft2 (1.5 m2) of surface at a thickness of 1/4 in (6.3 mm)QUIKRETE Re-Cap Concrete Resurfacer, No. 1131-47 - Data Sheet (Revised January 2023)
YieldQUIKRETE Re-Cap Concrete Resurfacer No. 1131-47 (40 lb bag)one 40 lb bag, 1/16 in thicknessapproximately 65 ft2 (6.0 m2) per bag when applied at the 1/16 in (1.6 mm) thickness with a broom or squeegeeQUIKRETE Re-Cap Concrete Resurfacer, No. 1131-47 - Data Sheet (Revised January 2023)
YieldQUIKRETE Re-Cap Concrete Resurfacer No. 1131-40 (older revision, 40 lb bag)one 40 lb bag, 1/4 inapproximately 17 ft2 (1.6 m2) of surface at a thickness of 1/4 in (6 mm)QUIKRETE Re-Cap Concrete Resurfacer, No. 1131-40 - Data Sheet (older revision) (Revised 25 July 2018)
YieldQUIKRETE Concrete Resurfacer No. 1131-40 (20 lb pail / 40 lb bag)one 40 lb bag, 1/4 inapproximately 17 ft2 (1.6 m2) of surface at a thickness of 1/4 in (6.4 mm)QUIKRETE Concrete Resurfacer, No. 1131-40 (20 lb pail / 40 lb bag) - Data Sheet (undated)
YieldQUIKRETE Concrete Resurfacer No. 1131-40 (20 lb pail / 40 lb bag)one 40 lb bag, minimum thickness (value not printed on sheet)approximately 90 ft2 (8.4 m2) per bag when applied at the minimum thickness with a broom or squeegeeQUIKRETE Concrete Resurfacer, No. 1131-40 (20 lb pail / 40 lb bag) - Data Sheet (undated)
Bagged concrete28 values
Bagged concrete: disputed values, the first listed
WhatProduct or caseValueDocument
YieldQUIKRETE Concrete Mix No. 1101Per bag; sheet lists 90 lb as regional availability0.675 ft3 (19.1 L)QUIKRETE Concrete Mix No. 1101 - Product Data Sheet (Product No. 1101-40, -50, -60, -80, -90) (Revised October 2022)
YieldSAKRETE 5000 Plus Concrete MixPer 60 lb bag; yield approximate0.47 ft3Sakrete 5000 Plus Concrete Mix - Technical Data Sheet (copyright 2023)
YieldSAKRETE High-Strength Concrete MixPer 90 lb bag0.66 ft3Sakrete High-Strength Concrete Mix - Technical Data Sheet (copyright 2023; file in 2024/01 uploads folder)
Curing cold daysQUIKRETE Concrete Mix No. 1101Curing; colder = 50 F to 70 F (10 C to 21 C)7 days in colder weather (50-70 F)QUIKRETE Concrete Mix No. 1101 - Product Data Sheet (Product No. 1101-40, -50, -60, -80, -90) (Revised October 2022)
Curing cold daysQUIKRETE Fast-Setting Concrete Mix (No. 1004-50 / 1004-60)Cold band printed as 60 F to 70 Fseven days in cold weather [60 F to 70 F]QUIKRETE Fast-Setting Concrete Mix - Product Data Sheet (Product No. 1004-50, 1004-60, 1004-66) (Revised November 2025)

15 more values for this topic are in our data, not listed here.

Decking39 values
Decking: disputed values, the first listed
WhatProduct or caseValueDocument
End-to-end (butt) gap by installation temperature and warmest annual temperatureDeckorators grooved decking (5/4x6, hidden fasteners)installed at 80 F; warmest annual temperature expected in region 80 F1/8 inGrooved Decking Installation Instructions Using Hidden Fasteners (5/4x6 grooved) (copyright 2024 (printed footer))
End-to-end (butt) gap by installation temperature and warmest annual temperatureDeckorators grooved decking (5/4x6, hidden fasteners)installed at 80 F; warmest annual temperature expected in region 90 F1/8 inGrooved Decking Installation Instructions Using Hidden Fasteners (5/4x6 grooved) (copyright 2024 (printed footer))
End-to-end (butt) gap by installation temperature and warmest annual temperatureDeckorators grooved decking (5/4x6, hidden fasteners)installed at 80 F; warmest annual temperature expected in region 100 F1/8 inGrooved Decking Installation Instructions Using Hidden Fasteners (5/4x6 grooved) (copyright 2024 (printed footer))
End-to-end (butt) gap by installation temperature and warmest annual temperatureDeckorators grooved decking (5/4x6, hidden fasteners)installed at 80 F; warmest annual temperature expected in region 110 F1/8 inGrooved Decking Installation Instructions Using Hidden Fasteners (5/4x6 grooved) (copyright 2024 (printed footer))
End-to-end (butt) gap by installation temperature and warmest annual temperatureDeckorators grooved decking (5/4x6, hidden fasteners)installed at 80 F; warmest annual temperature expected in region 120 F1/8 inGrooved Decking Installation Instructions Using Hidden Fasteners (5/4x6 grooved) (copyright 2024 (printed footer))

34 more values for this topic are in our data, not listed here.

Fence installation16 values
Fence installation: disputed values, the first listed
WhatProduct or caseValueDocument
Hole diameter multiple of post widthWood fence post set in concrete (QUIKRETE how-to)Wood posts; example 4 in post gives about 12 in hole3 times the width of the postSetting Posts without Mixing (QUIKRETE how-to, project instructions) (undated web page)
Hole diameterVeranda vinyl fence, Glendale (Barrette)Vinyl panel fence12" in diameterVinyl Fence Installation Instructions (Veranda Glendale) (rev 3-21 (from file name; no date printed))
Hole diameterVeranda SlideLock kit 73002103 (Barrette)SlideLock vinyl panel kit10" in diameterVinyl Fence Installation Instructions (SlideLock, kit 73002103) (rev 3-21 (from file name; no date printed))
Gravel depth per holeAluminum pre-built fence (Barrette)Materials listGravel/Filler (6" per hole)Aluminum Pre-Built Fence installation instructions (WEB REV 1.21)
Gravel depth per holeHorizontal privacy fence (Active Yards)Materials listCoarse Gravel (6" per hole)Horizontal Privacy Fence installation instructions (Active Yards) (WEB REV 3.22)

4 more values for this topic are in our data, not listed here.

Fence materials1 value
Fence materials: disputed values, the first listed
WhatProduct or caseValueDocument
Coating processMerchants Metals galvanized chain link fabric, 11 gaStatement on coating process (GBW/GAW)Fabric woven from 11 ga. wire and fabric woven in mesh sizes less than 1-3/4 in. are GBW.Merchants Metals Spec Tech: Zinc Coated (Galvanized) Steel Chain Link Fence Fabric (Revised April 2021 (printed))
Footing forms and tubes24 values
Footing forms and tubes: disputed values, the first listed
WhatProduct or caseValueDocument
Bags of 60 lb concrete mix for 4 ft of tube heightSonotube Builder's Tube (Sonoco)Sonotube Builder's Tube, nominal 12 in diameter, 4 ft tube height8 (row BAGS (60 LB) OF CONCRETE MIX)Sonotube Builder's Tube concrete forms — product page (page footer: © 2026 Sonoco Products Company)
Available nominal diametersSonotube Builder's Tube (Sonoco)Sonotube Builder's Tube, product page table headersCONCRETE FORMING TUBE 8" DIA 10" DIA 12" DIA 16" DIASonotube Builder's Tube concrete forms — product page (page footer: © 2026 Sonoco Products Company)
Available nominal diametersSonotube Builder's Tube (Sonoco)Sonotube Builder's Tube, standard sizesAvailable in 6", 8", 10" and 12" diametersSonotube Builder's Tube concrete forms — brochure (printed 16013/0716/1M) (©2016 Sonoco; printed 16013/0716/1M)
Usage stated for the 4 ft bag tableSonotube Builder's Tube (Sonoco)Table footnote, bag counts for 4 ft of tube heightFOR BELOW GROUND USE ONLY.Sonotube Builder's Tube concrete forms — product page (page footer: © 2026 Sonoco Products Company)
StrippingSonotube Builder's Tube (Sonoco)Sonotube Builder's Tube, generalThey are not designed to be stripped.Sonotube Builder's Tube concrete forms — product page (page footer: © 2026 Sonoco Products Company)

19 more values for this topic are in our data, not listed here.

Lumber and panels9 values
Lumber and panels: disputed values, the first listed
WhatProduct or caseValueDocument
Thickness range unsanded touch sanded overlaidStructural plywood, 7/8 in performance category (PERF CAT)Unsanded, touch-sanded and overlaid grades; tolerance +/-0.8 mm (1/32 in) at PERF CAT 13/16 and less (Table 10 note a); sanded grades not recorded heremin 21.11 mm (0.831 in), max 23.34 mm (0.916 in)Voluntary Product Standard PS 1-22, Structural Plywood (October 2, 2023 (final, clean))
Size tolerance minusStructural plywood, panel length and width toleranceTolerance on the manufacturer's stated length and/or width (section 5.10.1); plus tolerance is zeroplus zero (0) mm, minus 1.6 mm (1/16 in)Voluntary Product Standard PS 1-22, Structural Plywood (October 2, 2023 (final, clean))
Thickness rangeWood structural panel, 7/8 in performance category (PERF CAT)Panel thickness requirement for each performance category (Table 1); tolerance +/-0.8 mm (1/32 in) at 13/16 and lessmin 21.11 mm (0.831 in), max 23.34 mm (0.919 in)Voluntary Product Standard PS 2-18, Performance Standard for Wood Structural Panels (March 2019 (effective March 30, 2019))
Size tolerance plusminusWood structural panels, length and width toleranceTolerance on the manufacturer's stated length and/or width (section 5.2.1.1 'Size', PDF p. 9)plus or minus 1.6 mm (1/16 in.)Voluntary Product Standard PS 2-18, Performance Standard for Wood Structural Panels (March 2019 (effective March 30, 2019))
Dressed sizeWestern Red Cedar fence rail, nominal 6 in widthDressed size as printed on the WRCLA fence specifications page; moisture condition not stated5-1/2 in (140 mm)Western Red Cedar Fence Specifications (web page as retrieved 2026-10-13 (no edition date printed))

4 more values for this topic are in our data, not listed here.

Block, mortar and retaining walls27 values
Block, mortar and retaining walls: disputed values, the first listed
WhatProduct or caseValueDocument
Yield 8x8x16 blocks per bagQUIKRETE Mortar Mix 1102, 80 lb bag80 lb bag, Mortar Mix No. 1102 (ASTM C270/C1714 Type N), 8x8x16 standard blockwill lay up to 37 standard bricks or 13 standard (8 in by 8 in by 16 in ...) blocksQUIKRETE Mortar Mix No. 1102 - Product Data Sheet (Revised November 2020)
Yield standard bricks per bagQUIKRETE Mortar Mix 1102, 80 lb bag80 lb bag; brick size not printed on the 2020 sheetup to 37 standard bricksQUIKRETE Mortar Mix No. 1102 - Product Data Sheet (Revised November 2020)
Coverage 8x8x16 blocks per bagQUIKRETE Mortar Mix 1102 (older sheet), 80 lb bag80 lb bag; Table 1 Mortar Mix Usage Chart; block 8 in x 8 in x 16 in (200 x 200 x 410 mm)80-lb. 12 37QUIKRETE Mortar Mix No. 1102 - older data sheet (Table 1 Mortar Mix Usage Chart) (undated (edition not printed))
Coverage blocks per bagSAKRETE Mortar Mix Type S (US), 80 lb bag80 lb bag; block described only as '8 in (200 mm) concrete block' (length not printed)Will lay 12 = 8" (200 mm) concrete blockSAKRETE Mortar Mix, Type S - Mortar/Stucco Mix spec sheet (US) (Rev. 05/18)
Coverage standard bricks per bagSAKRETE Mortar Mix Type S (US), 80 lb bag80 lb bag; brick size not printed35 standard bricksSAKRETE Mortar Mix, Type S - Mortar/Stucco Mix spec sheet (US) (Rev. 05/18)

22 more values for this topic are in our data, not listed here.

Pavers26 values
Pavers: disputed values, the first listed
WhatProduct or caseValueDocument
Base thickness minResidential driveways on well-drained soils: compacted baseWell-drained soils6 in. (150 mm)PAV-TEC-002-22 Construction of Interlocking Concrete Pavements (Revised 2022 (page dateModified 2024-12-12))
Slope minInterlocking concrete pavement: grade slopeMinimum slope for pavement grade (general text)1.5%PAV-TEC-002-22 Construction of Interlocking Concrete Pavements (Revised 2022 (page dateModified 2024-12-12))
Slope minUnilock: minimum slope away from houseMinimum recommended for site drainage2% or 1/4" per every foot of pavementUnilock Advanced Tech Guide (Uploaded 2019-11 (final-lr))
Pieces per sqftNicolock Rustico 6 x 9 x 2 3/8 inTable row B; printed value 3 does not match 300 pcs / 113 sq ft = 2.65 (see NOTES.md)3 pcs/sq ftRustico 6x6 & 6x9 Pavers (product page) (Undated web page (fetched 2026-10-13))
Weight per piecePavestone Holland Stone, 80 mmPrinted in Wt./Stone row, 80 mm column; does not match 2,988 lb per pallet / 384 pcs (see NOTES.md)8.1 lbs.Holland Stone Series Concrete Pave Stones (SKU CM 051v9) (SKU CM 051v9; sheet copyright 2011)

5 more values for this topic are in our data, not listed here.

Prices26 values
Prices: disputed values, the first listed
WhatProduct or caseValueDocument
Order priceReady-mix concrete, Curb Cart Concrete, Murray/Lehi UT, 5-bag mix 3500 psi, 1/4 yardretail price for a total order of the stated yardage; mixes 5-bag 3500 psi / 6-bag 4000 psi / 7-bag 5300 psi; tax not included; page conflicts on fuel surcharge (see notes); order of 1/4 yard$200 USD per order (stated yardage)How Much Does Concrete Cost in Utah? Curb Cart Concrete pricing (Undated; footer shows copyright 2026)
Order priceReady-mix concrete, Curb Cart Concrete, Murray/Lehi UT, 5-bag mix 3500 psi, 1/2 yardretail price for a total order of the stated yardage; mixes 5-bag 3500 psi / 6-bag 4000 psi / 7-bag 5300 psi; tax not included; page conflicts on fuel surcharge (see notes); order of 1/2 yard$235 USD per order (stated yardage)How Much Does Concrete Cost in Utah? Curb Cart Concrete pricing (Undated; footer shows copyright 2026)
Order priceReady-mix concrete, Curb Cart Concrete, Murray/Lehi UT, 5-bag mix 3500 psi, 3/4 yardretail price for a total order of the stated yardage; mixes 5-bag 3500 psi / 6-bag 4000 psi / 7-bag 5300 psi; tax not included; page conflicts on fuel surcharge (see notes); order of 3/4 yard$270 USD per order (stated yardage)How Much Does Concrete Cost in Utah? Curb Cart Concrete pricing (Undated; footer shows copyright 2026)
Order priceReady-mix concrete, Curb Cart Concrete, Murray/Lehi UT, 5-bag mix 3500 psi, 1 yardretail price for a total order of the stated yardage; mixes 5-bag 3500 psi / 6-bag 4000 psi / 7-bag 5300 psi; tax not included; page conflicts on fuel surcharge (see notes); order of 1 yard$315 USD per order (stated yardage)How Much Does Concrete Cost in Utah? Curb Cart Concrete pricing (Undated; footer shows copyright 2026)
Order priceReady-mix concrete, Curb Cart Concrete, Murray/Lehi UT, 5-bag mix 3500 psi, 1 1/4 yardsretail price for a total order of the stated yardage; mixes 5-bag 3500 psi / 6-bag 4000 psi / 7-bag 5300 psi; tax not included; page conflicts on fuel surcharge (see notes); order of 1 1/4 yards$365 USD per order (stated yardage)How Much Does Concrete Cost in Utah? Curb Cart Concrete pricing (Undated; footer shows copyright 2026)

21 more values for this topic are in our data, not listed here.

Permits, fence rules and dig notices14 values
Permits, fence rules and dig notices: disputed values, the first listed
WhatProduct or caseValueDocument
Advance noticeMaryland: 811 locate noticeNotice to the state one-call center before excavation, as summarized by CGA2 business days811 by state: Maryland (CGA 811 state page) (undated page (page metadata shows 2025 updates))
Advance noticeSouth Carolina: 811 locate noticeNotice to the state one-call center before excavation, as summarized by CGANo less than 3 working days and no more than 10 working days811 by state: South Carolina (CGA 811 state page) (undated page (page metadata shows 2025 updates))
Advance noticeSouth Carolina: notice period (statute)Notice for excavation not involving a subaqueous facility, per statute text in the code filewithin three to twelve full working daysS.C. Code Title 58 Chapter 36 - Underground Facility Damage Prevention and Safety Act (code text with versions effective 22 May 2026 and until 22 May 2026)
Advance noticeMaryland: start-work window (statute)Start work date chosen when the ticket is initiated; minimum conflicts with CGA summary (2 business days)not sooner than 3 business days after the ticket is initiated; not later than 12 business days after the ticket is initiatedMaryland Public Utilities Article 12-124 (excavation ticket; start date; validity) (Code, current (mgaleg.maryland.gov))
Fence building permit thresholdPhoenix residential fenceAccessory to 1-2 family dwellings and townhouses. 2013 zoning table lists DSD permit for fences up to 6 ft.fences not over 3 feet exempt; taller fences need a building permitWork Exempt from Permit (building handout) (edition not printed on file)

9 more values for this topic are in our data, not listed here.

Concrete slabs, joints and bases30 values
Concrete slabs, joints and bases: disputed values, the first listed
WhatProduct or caseValueDocument
Control joint spacingQUIKRETE project guide, 4-in slab4-inch thick slab workspaced every 6' to 8' in 4"-thick slab workQUIKRETE project guide: Concrete Sidewalks and Small Slabs (Undated (no edition printed in extracted text))
Control joint spacingConcrete slab on grade, 4-in thickPrinted example for a 4-inch slabin a 4-inch [100 mm] thick slab the joint spacing should be about 10 feet [3 m]NRMCA CIP 6 - Joints in Concrete Slabs on Grade (copy hosted by prairie.com) (Revision years printed: 1979, 1989, 1998)
Control joint spacingConcrete slab on grade, 4-in thickDerived from CIP 6 24-36x rule for a 4-in slab8 to 12 ftWorked out by us from the printed valueNRMCA CIP 6 - Joints in Concrete Slabs on Grade (copy hosted by prairie.com) (Revision years printed: 1979, 1989, 1998)
Control joint spacingSidewalk joints, 8 ft wide walkJoint spacing L x W; 8 ft walk split into 4 ft panels by longitudinal joint8' 4.5' x 4'City of Minot Standard Details STR-7: Sidewalks & Pathways (Last revision 12/18/2020 (drawing file in 2025 folder))
Control joint spacingSidewalk weakened plane joints, 8 ft wide walk8 ft wide walk, no longitudinal joint notedeight (8) feet on center for eight (8) feet wide walksSFD Residential Guidelines: City Sidewalk & Driveway (handout) (Undated)

15 more values for this topic are in our data, not listed here.

Mixers and tools12 values
Mixers and tools: disputed values, the first listed
WhatProduct or caseValueDocument
Operating weightMultiquip MC64P (polyethylene drum, 6 cu ft)Average weight, shown as average; exact weight depends on power source (brochure footnote)685 lb (311 kg)MQ Essick Mixers Brochure (Copyright 2022 (printed on last page))
Operating weightMultiquip MC94P (polyethylene drum, 9 cu ft)Average weight, shown as average; exact weight depends on power source (brochure footnote)800 lb (363 kg)MQ Essick Mixers Brochure (Copyright 2022 (printed on last page))
Operating weightMultiquip MC64P Series (6 cu ft, polyethylene)Series page as printed656 lb / 1510 kgMC64P Series - Multiquip product page (page retrieved 2026-10-13)
Operating weightMultiquip MC64PH8 (6 cu ft, Honda GX240)Model page as printed685 lb / 1510 kgMC64PH8 - Multiquip product page (page retrieved 2026-10-13)
Operating weightMultiquip MC94PH8 (9 cu ft, Honda GX240)Model page as printed656 lb / 1510 kgMC94PH8 - Multiquip product page (page retrieved 2026-10-13)

7 more values for this topic are in our data, not listed here.

Wood durability and treatment2 values
Wood durability and treatment: disputed values, the first listed
WhatProduct or caseValueDocument
Ground contact - heavy duty minimum actives retentionWolmanized Outdoor, CA-C (ICC-ES ESR-1721)Minimum actives retention, pcf (kg/m3), CA-C column of ESR-1721 Table 1. Product-specific evaluation report.0.25 (4.0) pcfICC-ES Evaluation Report ESR-1721: Wolmanized Outdoor Preservative-Treated Wood (ESR-1721, copy hosted by Arxada (2020 file name))
CA-C preservative retention (as printed)Wolmanized Outdoor CA-C end use: Posts (heavy duty ground contact)Arxada 'Specification Guide for Treated Wood End Uses', CA-C column, section DECKS. Use Category printed by the treater: 4B.0.31 lb/ft3Wolmanized Outdoor product information and Specification Guide for Treated Wood End Uses (WOW-5085-R11) (2022, form WOW-5085-R11)
  • QUIKRETE documents are named without a link, as QUIKRETE’s terms ask.
  • A document marked “Search excerpt” was seen only in search results; its value is weaker until we read the page itself.
  • A value marked “Worked out by us” is our arithmetic on a printed number, kept beside it so the two can be compared.

How calculators differ

We ran the same cases by hand through free online calculators whose terms allow it, with the same inputs, and wrote down what each one printed. Where they differ, the cause is method: whether a gate is counted, whether waste is added, which density turns a volume into tons. Each case below opens to its table.

Fence 100 ft, 6 ft high3 calculators
Fence 100 ft, 6 ft high: what each calculator printed
ResultDIYCalcsCalcShedJobsite Calcs
Posts14 posts15 posts16 posts
Rails39 rails39 rails36 rails
Pickets230 pickets210 pickets220 pickets
Sections13 sectionsNot printedNot printed
Concrete bags (80 lb), 14 posts in 10 in x 36 in holes33 bagsNot printedNot printed
Concrete bags (50 lb fast-setting), 14 posts in 10 in x 36 in holes52 bagsNot printedNot printed
Concrete bags, 50 lbNot printed30 bags16 bags
Post length / hole depthNot printed3 ftNot printed
Screw boxes, 100 ctNot printedNot printed14 boxes
Gate kitsNot printedNot printed1 kit
DIYCalcs:
100 ft, 8 ft spacing, 3 rails, picket 5.5 in, gap 0, corners 0, waste 5% (page default). No gate input on tool.
CalcShed:
100 ft, 6 ft, 8 ft spacing, 1 gate 4 ft, picket 5.5 in, gap 0, waste 0% (selected). Gate position not entered; tool uses a split-run allowance.
Jobsite Calcs:
100 ft privacy (no gaps), 6 ft, 8 ft spacing, 3 rails, picket 5.5 in, 1 gate 4 ft. Tool has no waste input.
One 4x4 post, 6 ft above ground, 10 in hole1 calculator
One 4x4 post, 6 ft above ground, 10 in hole: what each calculator printed
ResultDIYCalcs
Bags (50 lb fast-setting)4 bags
Bags (80 lb)3 bags
Concrete volume per post1.38 cu ft
DIYCalcs:
one 4x4 post (3.5 in), 10 in hole, 36 in depth (half of 6 ft above ground = 3 ft in ground). Bag: 50 lb fast-setting (0.375 cu ft).

Other calculators ran this case too. Their terms don’t allow their results on a site like this one, so they aren’t shown.

Slab 12 x 12 ft, 4 in1 calculator
Slab 12 x 12 ft, 4 in: what each calculator printed
ResultDIYCalcs
Concrete volume1.78 cu yd
Bags (80 lb)80 bags
Bags (60 lb)107 bags
DIYCalcs:
12 ft x 12 ft x 4 in, 1 slab. Waste 0 (run override; page default 10%).

Other calculators ran this case too. Their terms don’t allow their results on a site like this one, so they aren’t shown.

Patio 12 x 16 ft, 4x8 pavers1 calculator
Patio 12 x 16 ft, 4x8 pavers: what each calculator printed
ResultDIYCalcs
Pavers needed864 pavers
Base gravel volume (compacted)2.74 cu yd
Base gravel weight4.1 US tons
Bedding sand volume0.58 cu yd
Bedding sand weight0.79 US tons
DIYCalcs:
patio 12 ft x 16 ft, 8 in x 4 in pavers, waste 0 (run override; page default 10%), base 4 in and sand 1 in (page defaults; not in scenario).
Mulch, 200 sq ft bed, 3 in deep2 calculators
Mulch, 200 sq ft bed, 3 in deep: what each calculator printed
ResultDIYCalcsTheSiteMath
Volume1.85 cu yd1.85 cu yd
Volume50 cu ft50 cu ft
Bags, 2 cu ft25 bags25 bags
Annual top-up volumeNot printed0.37 cu yd
Annual top-up bags, 2 cu ftNot printed5 bags
Annual settling lossNot printed0.6 in
DIYCalcs:
20 x 10 ft bed, 3 in depth, 2 cu ft bag. Tool has no waste input.
TheSiteMath:
20 x 10 ft, bed type 'Slope/Erosion Control (3 in depth)', hardwood, 2 cu ft bag. Existing depth blank.
Gravel driveway 10 x 40 ft, 4 in deep2 calculators
Gravel driveway 10 x 40 ft, 4 in deep: what each calculator printed
ResultDIYCalcsCalcShed
Volume4.94 cu yd4.94 cu yd
Weight6.91 US tons7 US tons
Density used1.4 US tons per cu ydNot printed
WeightNot printed14,000 lb
Density usedNot printed105 lb/ft3
DIYCalcs:
10 x 40 ft, 4 in deep, crushed stone #57, 0% extra.
CalcShed:
40 x 10 ft, 4 in thickness, crushed stone #57, 0% overage.
Board feet: 10 boards 2x6x83 calculators
Board feet: 10 boards 2x6x8: what each calculator printed
ResultDIYCalcsJobsite CalcsCalcShed
Board feet80 BF80 BF80 BF
Board feet per board8 BF8 BFNot printed
Pieces to orderNot printedNot printed10 pieces
DIYCalcs:
10 boards, nominal 2 in x 6 in x 8 ft, price $5/BF page default (cost not recorded).
Jobsite Calcs:
2x6, 8 ft, quantity 10, nominal dimensions.
CalcShed:
2x6, 8 ft, 10 pieces, nominal/billed basis (page default), waste 0%.
Concrete column 12 in diameter, 4 ft deep2 calculators
Concrete column 12 in diameter, 4 ft deep: what each calculator printed
ResultDIYCalcsCalcShed
Concrete volume3.14 cu ft3.141 cu ft
Bags, 60 lb (total)7 bags7 bags
Bags, 60 lb (exact)6.98 bags6.98 bags
Bags, 80 lb (total)6 bags6 bags
Bags, 80 lb (exact)5.24 bags5.24 bags
DIYCalcs:
1 hole, 12 in diameter, 4 ft deep, post 'None' (ignore post volume), no allowance.
CalcShed:
1 hole, 12 in diameter, 48 in deep; post entered as custom 0.1 x 0.1 in (form rejects 0; no no-post option); planning allowance 0%.
Deck boards 12 x 16 ft, 5.5 in boards, 1/8 in gap2 calculators
Deck boards 12 x 16 ft, 5.5 in boards, 1/8 in gap: what each calculator printed
ResultDIYCalcsCalcShed
Boards, 16 ft26 boards26 boards
Linear feet of decking416 ft416 ft
Deck screws, 2 per joist676 screwsNot printed
CoursesNot printed26 courses
Final course widthNot printed3.38 in
DIYCalcs:
16 ft x 12 ft deck, 5.5 in boards, 1/8 in gap, 16 ft boards along length, 0% extra, joists 16 in o.c.
CalcShed:
16 x 12 ft deck, 5.5 in boards, 0.125 in gap, 16 ft stock, 0% extra, no fasteners.

Some widely used calculators count bagged concrete by its weight at an assumed density instead of the yield printed on the bag, and some leave the post out when they work out the concrete in a post hole. Their terms forbid commercial use of their results, so their numbers are not shown here.

What we don’t check

A plan is a starting point for buying and digging. These are things it can’t know:

  • Local codes and permits. We record rules some cities and states publish, but your city, county and homeowners’ association decide. Ask your permit office before you build.
  • Your ground. Soil, drainage, slope and frost depth at your address change how deep to dig and how much base to lay.
  • Engineering. Spans, loads, retaining walls and anything a person stands on or behind need a design checked by a qualified person. The deck planner waits for span values from a state’s or city’s published code, the only kind of code value we take.
  • Prices. Most stores don’t publish prices openly, and the ones we found change by region and week. The planners show no prices for now.
  • Buried lines. Only your state’s call-before-you-dig service can mark them.

Report a wrong number

If a number here or on a plan doesn’t match its document, we want to know. A contact address is coming; until it is published, this site has no way to send us a note, and we won’t pretend otherwise. Fixes are listed on the Corrections page with the date and what changed.